Checked content

File:CPRR Summit Tunnel Central Shaft.jpg

Summary

The vertical central shaft of the CPRR "Summit Tunnel" (Tunnel #6) at Donner Summit which allowed drilling and excavation of the tunnel to be carried out on four faces at once during construction of the 1,659 foot tunnel over a period of 15 months in 1866-67.

Original digital photograph taken by the uploader ( Centpacrr) inside the Summit Tunnel in August, 2003.

Licensing

I, the copyright holder of this work, hereby publish it under the following licenses:
You may select the license of your choice.
The following pages on Schools Wikipedia link to this image (list may be incomplete):

Metadata

What is Schools Wikipedia?

Wikipedia for Schools brings Wikipedia into the classroom. SOS Children is a global charity founded in 1949 to give children who have lost everything the childhood they deserve. Help another child by taking out a sponsorship.